Schneider Electric
Schneider Electric sells all-in-one LFP battery systems for microgrids in 7-ft and 20-ft enclosures up to 1,720 kWh, rated for 6,000+ cycles. It pairs them with EcoStruxure Microgrid controls and Galaxy UPS for data centers.
Visit Schneider Electric Compare with similar providers Request a quote
Energy per unit 1.72 MWh
Cycle life 6,000 cycles
Data center offer
SourceMarkets end-to-end BESS integrated with EcoStruxure Microgrid Operation and Advisor alongside the Galaxy VXL UPS (1.25 MW in 1.2 m²) for data centers (Data Centre Magazine, April 2026).
How to read these numbers
Launched April 2024: LFP, 15-20 year calendar life, 6,000+ cycles, 2 h and 4 h configurations. Top power is reported as 500 kW (pv magazine) or 2 MW (Solar Power World).
Facts
Source per value- Type Editorial supply-chain classification based on the sourced portfolio: system integrator, cell manufacturer, non-lithium or mechanical storage developer, power equipment group, or software and controls supplier.
- Power and infrastructure major 1
- Chemistry Main storage chemistry of the flagship product. LFP is lithium iron phosphate; NMC is lithium nickel manganese cobalt oxide; LTO is lithium titanate. Mechanical covers gravity, compressed air and CO2 stores. Mixed means the vendor sells more than one chemistry at scale.
- LFP 1
- Flagship product The vendor's main grid-scale or commercial storage product line, as the vendor names it.
- BESS for microgrids 1
- Energy per unit MWh Energy of one flagship unit (usually a 20-ft container or one enclosure), as the vendor publishes it. Rating basis (usable or nameplate, beginning of life) is in the spec notes.
- 1.72 1
- Duration Discharge durations the vendor offers at rated power, in hours, as published (for example 2-4 h, or 100 h).
- 2 h, 4 h 2
- Deployed GWh Cumulative storage the vendor says it has deployed, delivered or shipped, in GWh, at the date of the cited source. Shipments and installed capacity differ; the spec notes say which one the vendor reports.
- Not published
- Deployed + contracted GWh Deployed plus contracted or awarded storage (backlog under contract) in GWh, as the vendor states it. Blank when the vendor publishes no contracted figure.
- Not published
- Cycle life cycles Rated cycle life of the flagship cell or system as the vendor publishes it. Test conditions (temperature, depth of discharge, end-of-life capacity) differ by vendor and are in the spec notes.
- 6,000 1
- Warranty years Longest standard product or performance warranty term the vendor publishes for the flagship system, in years.
- Not published
- UL 9540 The vendor states a named system in this record is certified or listed to UL 9540. The spec notes identify any earlier product or model-specific scope.
- Not published
- UL 9540A A cited manufacturer statement or published report describes UL 9540A testing for a named system or cell in the record. Read the spec notes for the model and test level; this is not a blanket certification of all products.
- Not published
- Data center offer The vendor markets a storage product, reference or program for data centers: backup, UPS, grid-interactive UPS, load smoothing for AI training, or bridging power while a grid connection is built.
- Yes 3
- Parent Owner or parent group when the provider is a subsidiary or joint venture.
- Not published
- Products Named storage products and cells, with sizes where published.
- BESS for microgrids (7-ft and 20-ft, 60 kW to 2 MW); Boost Pro (EU C&I, up to 2 MWh); EcoStruxure Microgrid; Galaxy VXL UPS 2
- Market status Dated ownership, deal or operating context: joint ventures, acquisitions and manufacturing agreements.
- Not published
- Services Published integration, controls or lifecycle services offered by the provider.
- Not published
- Reference project A named project and its reported status and capacity. Project capacity is not a product unit rating.
- Not published
- Headquarters Headquarters city and country only when an explicit cited company statement supports the location.
- Not published
Sources
- pv magazine: Schneider Electric launches storage systems for microgrids accessed 2026-11-11
- Solar Power World: Schneider Electric releases 7-ft and 20-ft BESS accessed 2026-11-11
- Data Centre Magazine April 2026: Schneider Electric BESS for data centres accessed 2026-11-11
- Schneider Electric microgrid BESS launch, April 2024 accessed 2026-11-11
Get a quote from Schneider Electric and similar providers