Valo Energy (formerly Wärtsilä Energy Storage)
Valo Energy is the grid-scale storage company Wärtsilä and RCT Solutions own 50/50, formed from Wärtsilä’s energy storage business on 1 October 2026. It sells the GridSolv Quantum3 AC block and GEMS controls, with 20+ GWh across 130+ projects.
Visit Valo Energy Compare with similar providers Request a quote
How to read these numbers
Quantum3 is 5 MWh in a 20-ft container per a Wärtsilä spokesperson (Energy-Storage.news, Sep 2024). 20+ GWh and 130+ projects is the track record on valoenergy.com (Nov 2026). GridSolv Quantum was certified to UL 9540 in April 2022 (Eurofins MET Labs) and March 2023 (CSA) and met UL 9540A unit-level criteria in February 2023, per Wärtsilä; the original Quantum used CATL LFP cells. Named project: Atmos Teebar, 400 MW / 1,600 MWh.
Facts
Source per value- Type Editorial supply-chain classification based on the sourced portfolio: system integrator, cell manufacturer, non-lithium or mechanical storage developer, power equipment group, or software and controls supplier.
- Integrator 1
- Chemistry Main storage chemistry of the flagship product. LFP is lithium iron phosphate; NMC is lithium nickel manganese cobalt oxide; LTO is lithium titanate. Mechanical covers gravity, compressed air and CO2 stores. Mixed means the vendor sells more than one chemistry at scale.
- LFP 3
- Flagship product The vendor's main grid-scale or commercial storage product line, as the vendor names it.
- GridSolv Quantum3 2
- Energy per unit MWh Energy of one flagship unit (usually a 20-ft container or one enclosure), as the vendor publishes it. Rating basis (usable or nameplate, beginning of life) is in the spec notes.
- 5 2
- Duration Discharge durations the vendor offers at rated power, in hours, as published (for example 2-4 h, or 100 h).
- Not published
- Deployed GWh Cumulative storage the vendor says it has deployed, delivered or shipped, in GWh, at the date of the cited source. Shipments and installed capacity differ; the spec notes say which one the vendor reports.
- 20 1
- Deployed + contracted GWh Deployed plus contracted or awarded storage (backlog under contract) in GWh, as the vendor states it. Blank when the vendor publishes no contracted figure.
- Not published
- Cycle life cycles Rated cycle life of the flagship cell or system as the vendor publishes it. Test conditions (temperature, depth of discharge, end-of-life capacity) differ by vendor and are in the spec notes.
- Not published
- Warranty years Longest standard product or performance warranty term the vendor publishes for the flagship system, in years.
- Not published
- UL 9540 The vendor states a named system in this record is certified or listed to UL 9540. The spec notes identify any earlier product or model-specific scope.
- Yes 3
- UL 9540A A cited manufacturer statement or published report describes UL 9540A testing for a named system or cell in the record. Read the spec notes for the model and test level; this is not a blanket certification of all products.
- Yes 3
- Data center offer The vendor markets a storage product, reference or program for data centers: backup, UPS, grid-interactive UPS, load smoothing for AI training, or bridging power while a grid connection is built.
- Not published
- Parent Owner or parent group when the provider is a subsidiary or joint venture.
- Wärtsilä 50%; RCT Solutions 50% 1
- Products Named storage products and cells, with sizes where published.
- GridSolv Quantum3 (5 MWh, 20-ft AC block); Quantum2 (4 MWh DC block); GEMS energy management platform 1
- Market status Dated ownership, deal or operating context: joint ventures, acquisitions and manufacturing agreements.
- Wärtsilä closed the joint venture for its energy storage business with RCT Solutions on 1 October 2026; Valo is an independent company owned 50% by each. 5
- Services Published integration, controls or lifecycle services offered by the provider.
- Not published
- Reference project A named project and its reported status and capacity. Project capacity is not a product unit rating.
- Not published
- Headquarters Headquarters city and country only when an explicit cited company statement supports the location.
- Not published
Sources
- Valo Energy home page accessed 2026-11-11
- Energy-Storage.news: Wärtsilä joins 5MWh club with latest BESS product accessed 2026-11-11
- Wärtsilä: GridSolv Quantum passes UL 9540A requirements accessed 2026-11-11
- Valo Energy GridSolve BESS page accessed 2026-11-11
- Wärtsilä: Valo joint venture closed, 1 October 2026 accessed 2026-11-11