Canadian Solar e-STORAGE
Canadian Solar’s e-STORAGE unit builds SolBank 3.0 battery systems on Canadian Solar cells and had shipped over 20 GWh by 31 March 2026. It reported a $3.5 billion contracted backlog in May 2026 and is supplying 2.5 GWh to a US utility serving data center demand.
Visit Canadian Solar e-STORAGE Compare with similar providers Request a quote
Data center offer
Source500 MW / 2,493 MWh DC of SolBank 3.0 (about 500 containers) for a US utility supporting data center demand, shipping March to July 2027 (announced March 2026).
How to read these numbers
Shipped 20+ GWh as of 31 Mar 2026 and $3.5 billion contracted backlog as of 8 May 2026 (Canadian Solar release, June 2026). 5 MWh per SolBank 3.0 pack per the 426 MWh Florida project release. 15 GWh a year BESS and 3 GWh cell capacity.
Facts
Source per value- Type Editorial supply-chain classification based on the sourced portfolio: system integrator, cell manufacturer, non-lithium or mechanical storage developer, power equipment group, or software and controls supplier.
- Cell maker and integrator 2
- Chemistry Main storage chemistry of the flagship product. LFP is lithium iron phosphate; NMC is lithium nickel manganese cobalt oxide; LTO is lithium titanate. Mechanical covers gravity, compressed air and CO2 stores. Mixed means the vendor sells more than one chemistry at scale.
- Not published
- Flagship product The vendor's main grid-scale or commercial storage product line, as the vendor names it.
- SolBank 3.0 2
- Energy per unit MWh Energy of one flagship unit (usually a 20-ft container or one enclosure), as the vendor publishes it. Rating basis (usable or nameplate, beginning of life) is in the spec notes.
- 5 2
- Duration Discharge durations the vendor offers at rated power, in hours, as published (for example 2-4 h, or 100 h).
- Not published
- Deployed GWh Cumulative storage the vendor says it has deployed, delivered or shipped, in GWh, at the date of the cited source. Shipments and installed capacity differ; the spec notes say which one the vendor reports.
- 20 1
- Deployed + contracted GWh Deployed plus contracted or awarded storage (backlog under contract) in GWh, as the vendor states it. Blank when the vendor publishes no contracted figure.
- Not published
- Cycle life cycles Rated cycle life of the flagship cell or system as the vendor publishes it. Test conditions (temperature, depth of discharge, end-of-life capacity) differ by vendor and are in the spec notes.
- Not published
- Warranty years Longest standard product or performance warranty term the vendor publishes for the flagship system, in years.
- Not published
- UL 9540 The vendor states a named system in this record is certified or listed to UL 9540. The spec notes identify any earlier product or model-specific scope.
- Not published
- UL 9540A A cited manufacturer statement or published report describes UL 9540A testing for a named system or cell in the record. Read the spec notes for the model and test level; this is not a blanket certification of all products.
- Not published
- Data center offer The vendor markets a storage product, reference or program for data centers: backup, UPS, grid-interactive UPS, load smoothing for AI training, or bridging power while a grid connection is built.
- Yes 3
- Parent Owner or parent group when the provider is a subsidiary or joint venture.
- Not published
- Products Named storage products and cells, with sizes where published.
- SolBank 3.0 (5 MWh packs); SolBank 3.0 Plus; EPC and long-term service 2
- Market status Dated ownership, deal or operating context: joint ventures, acquisitions and manufacturing agreements.
- Not published
- Services Published integration, controls or lifecycle services offered by the provider.
- Not published
- Reference project A named project and its reported status and capacity. Project capacity is not a product unit rating.
- Not published
- Headquarters Headquarters city and country only when an explicit cited company statement supports the location.
- Not published
Sources
- Canadian Solar news release (e-STORAGE shipments and backlog) accessed 2026-11-11
- e-STORAGE to deliver 426 MWh in Florida (press release) accessed 2026-11-11
- e-STORAGE to deliver 2.5 GWh supporting US data center demand (press release) accessed 2026-11-11
Get a quote from Canadian Solar e-STORAGE and similar providers
Tell us what you need once. We send it to matching providers and they reply to you directly.