LG Energy Solution Vertech

LG Energy Solution's US integration arm delivers turnkey LFP storage on LG cells, with 11+ GWh of integrated projects installed, building or in contracting. Its JF2 AC Link made LG the first battery company in NVIDIA's DSX Ready program for AI factories.

Cell maker and integrator Checked

Visit LG Energy Solution Vertech Compare with similar providers Request a quote

Deployed + contracted 11 GWh

Data center offer

Source

Joined NVIDIA's DSX Ready ecosystem as a BESS company with the LFP JF2 AC Link (22 Sep 2026). A May 2026 turnkey deal with DTE Energy covers 6 GWh, reported as aimed at AI data center load.

How to read these numbers

11+ GWh of integrated ESS installed, in construction and in contracting, and 30 GWh of LG storage batteries deployed, ordered and in contracting globally, per LG's ESS SI page (Nov 2026). DTE: 6 GWh turnkey via Vertech (May 2026).

Sources for these notes

Facts

Source per value
Type Editorial supply-chain classification based on the sourced portfolio: system integrator, cell manufacturer, non-lithium or mechanical storage developer, power equipment group, or software and controls supplier.
Cell maker and integrator 1
Chemistry Main storage chemistry of the flagship product. LFP is lithium iron phosphate; NMC is lithium nickel manganese cobalt oxide; LTO is lithium titanate. Mechanical covers gravity, compressed air and CO2 stores. Mixed means the vendor sells more than one chemistry at scale.
Not published
Flagship product The vendor's main grid-scale or commercial storage product line, as the vendor names it.
JF2 AC Link 2
Energy per unit MWh Energy of one flagship unit (usually a 20-ft container or one enclosure), as the vendor publishes it. Rating basis (usable or nameplate, beginning of life) is in the spec notes.
Not published
Duration Discharge durations the vendor offers at rated power, in hours, as published (for example 2-4 h, or 100 h).
Not published
Deployed GWh Cumulative storage the vendor says it has deployed, delivered or shipped, in GWh, at the date of the cited source. Shipments and installed capacity differ; the spec notes say which one the vendor reports.
Not published
Deployed + contracted GWh Deployed plus contracted or awarded storage (backlog under contract) in GWh, as the vendor states it. Blank when the vendor publishes no contracted figure.
11 1
Cycle life cycles Rated cycle life of the flagship cell or system as the vendor publishes it. Test conditions (temperature, depth of discharge, end-of-life capacity) differ by vendor and are in the spec notes.
Not published
Warranty years Longest standard product or performance warranty term the vendor publishes for the flagship system, in years.
Not published
UL 9540 The vendor states a named system in this record is certified or listed to UL 9540. The spec notes identify any earlier product or model-specific scope.
Not published
UL 9540A A cited manufacturer statement or published report describes UL 9540A testing for a named system or cell in the record. Read the spec notes for the model and test level; this is not a blanket certification of all products.
Not published
Data center offer The vendor markets a storage product, reference or program for data centers: backup, UPS, grid-interactive UPS, load smoothing for AI training, or bridging power while a grid connection is built.
Yes 2
Parent Owner or parent group when the provider is a subsidiary or joint venture.
Not published
Products Named storage products and cells, with sizes where published.
JF2 AC Link (LFP); turnkey ESS integration and long-term service; LFP cells from LG's Michigan plant 1
Market status Dated ownership, deal or operating context: joint ventures, acquisitions and manufacturing agreements.
Not published
Services Published integration, controls or lifecycle services offered by the provider.
Not published
Reference project A named project and its reported status and capacity. Project capacity is not a product unit rating.
Not published
Headquarters Headquarters city and country only when an explicit cited company statement supports the location.
Not published

Sources

  1. LG Energy Solution ESS SI (Vertech) page accessed 2026-11-11
  2. Asiae: LG Energy Solution joins NVIDIA's DSX ecosystem accessed 2026-11-11
  3. Digital Daily: LG Energy Solution and DTE Energy ESS contract accessed 2026-11-11

Get a quote from LG Energy Solution Vertech and similar providers

Tell us what you need once. We send it to matching providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@bessproviders.com.