Prevalon, spun out of Mitsubishi Power Americas, integrates the 5 MWh HD5 platform for utilities and AI data centers, with 6+ GWh deployed across 35+ projects. Nextpower agreed in May 2026 to buy it for up to $365 million.

Integrator Owner: Mitsubishi Power Americas and EES joint venture; Nextpower agreed to acquire it (May 2026) Checked

Visit Prevalon Energy Compare with similar providers Request a quote

Energy per unit 5 MWh
Deployed 6 GWh

Data center offer

Source

Holds about 1.3 GW of firm supply contracts for AI and hyperscaler data center infrastructure (May 2026); partnered with Emerson on storage for data centers (2025). AESC will supply cells for HD5 and the Hybrid Power Stabilizer under a 10+ GWh agreement (June 2026).

How to read these numbers

HD5: 5 MWh per enclosure, liquid cooled, explosion detection to NFPA 69; large-scale fire test of four enclosures back to back under CSA TS-800. 6+ GWh deployed across 35+ projects per ESS News on the Nextpower deal (29 May 2026). Reference: 200 MW / 800 MWh for Idaho Power.

Sources for these notes

Facts

Source per value
Type Editorial supply-chain classification based on the sourced portfolio: system integrator, cell manufacturer, non-lithium or mechanical storage developer, power equipment group, or software and controls supplier.
Integrator 2
Chemistry Main storage chemistry of the flagship product. LFP is lithium iron phosphate; NMC is lithium nickel manganese cobalt oxide; LTO is lithium titanate. Mechanical covers gravity, compressed air and CO2 stores. Mixed means the vendor sells more than one chemistry at scale.
Not published
Flagship product The vendor's main grid-scale or commercial storage product line, as the vendor names it.
HD5 (AC and DC) 2
Energy per unit MWh Energy of one flagship unit (usually a 20-ft container or one enclosure), as the vendor publishes it. Rating basis (usable or nameplate, beginning of life) is in the spec notes.
5 2
Duration Discharge durations the vendor offers at rated power, in hours, as published (for example 2-4 h, or 100 h).
Not published
Deployed GWh Cumulative storage the vendor says it has deployed, delivered or shipped, in GWh, at the date of the cited source. Shipments and installed capacity differ; the spec notes say which one the vendor reports.
6 1
Deployed + contracted GWh Deployed plus contracted or awarded storage (backlog under contract) in GWh, as the vendor states it. Blank when the vendor publishes no contracted figure.
Not published
Cycle life cycles Rated cycle life of the flagship cell or system as the vendor publishes it. Test conditions (temperature, depth of discharge, end-of-life capacity) differ by vendor and are in the spec notes.
Not published
Warranty years Longest standard product or performance warranty term the vendor publishes for the flagship system, in years.
Not published
UL 9540 The vendor states a named system in this record is certified or listed to UL 9540. The spec notes identify any earlier product or model-specific scope.
Not published
UL 9540A A cited manufacturer statement or published report describes UL 9540A testing for a named system or cell in the record. Read the spec notes for the model and test level; this is not a blanket certification of all products.
Not published
Data center offer The vendor markets a storage product, reference or program for data centers: backup, UPS, grid-interactive UPS, load smoothing for AI training, or bridging power while a grid connection is built.
Yes 1
Parent Owner or parent group when the provider is a subsidiary or joint venture.
Mitsubishi Power Americas and EES joint venture; Nextpower agreed to acquire it (May 2026) 1
Products Named storage products and cells, with sizes where published.
HD5 AC; HD5 DC; Hybrid Power Stabilizer 4
Market status Dated ownership, deal or operating context: joint ventures, acquisitions and manufacturing agreements.
Not published
Services Published integration, controls or lifecycle services offered by the provider.
Not published
Reference project A named project and its reported status and capacity. Project capacity is not a product unit rating.
Not published
Headquarters Headquarters city and country only when an explicit cited company statement supports the location.
Not published

Sources

  1. ESS News: Nextpower buys Prevalon Energy, 6 GWh installed and AI data center deals accessed 2026-11-11
  2. Power Engineering: Prevalon completes large-scale fire testing of HD5 accessed 2026-11-11
  3. Emerson and Prevalon collaborate on storage for data centers accessed 2026-11-11
  4. AESC and Prevalon sign 10+ GWh supply agreement accessed 2026-11-11

Get a quote from Prevalon Energy and similar providers

Tell us what you need once. We send it to matching providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@bessproviders.com.